Skip to workspace
Workspace/Offline FAT
GuideChecking API
← Engineering release trains

NordDelta Nexus — Offline PLC Simulation & FAT

Create a revision-bound engineering record, ask an independent assigned engineer to review it, and download the resulting evidence.

Offline engineering only. Vendor-tool execution, physical commissioning and certification require separately recorded evidence.

Project and revision

Create a project or assign reviewers

Engineering input

Enter the measured inputs and attach the document fingerprints for this stage. An independent engineer reviews the saved record.

Measurements
Tests
Tests 1
Initial state
Steps
Steps 1
Set inputs
Logic
Logic 1
If
Then
Expected final

Independent review

Recorded review evidence